Category Archives: Steel Manufacturer

Here’s An Opinion On: Steel Frame Australia It is common that civil engineer needs to prepare drawings. It is carried out after the design of structure or civil works has been completed. How to have a proper drawing numbering system in order to has better presentation? Below are some tips on drawing numbering system. Time control. It is useful that a project starts with month and year. As for example, if an awarded project on say 12 April 2007 than your drawing number may 042007 and not 120402007, because it may become to complicate. On the other hand, you can select year as control item 2007. Initial drawing number will be 042007 Client name control. Let say, your client is ABC Company and with item 1; your drawing number will be ABC/042007. Engineering field control. Say your project is building a unit of structural building. You may further add with…

Read more

1/1